Starting point
The process, its data and decision flow
UAB Nėra-Bus
UAB Nėra-Bus reviews the actual manufacturing flow, its data and decision points, identifies the causes behind recurring disruption and works with the team to put the agreed operating routine into practice.
Starting point
The process, its data and decision flow
Working output
An action plan with owners and dates
Expertise
KPIs, ERP requirements and monitoring logic
FROM CAUSE TO ROUTINE
01
Define the problem
02
Follow the process
03
Check the data
04
Agree actions
05
Embed the routine
01
A missed production plan tells management that something is wrong, but not where to intervene. We follow the order through the operation: when a decision is taken, how information reaches the next station, where work waits and what the supervisor or operator can see at that point. System records are compared with what happens on the shop floor. The gap between the two often reveals more than either source on its own.
Our assessment produces a clear sequence of causes, decisions and responsibilities. It separates work that can start immediately from changes that require management approval or better data. Where records are unreliable, we do not turn them into a precise-looking percentage. We record the assumption, agree a practical measure and set a review date.
02
Even a documented process will stall if nobody knows who may change a priority or stop non-conforming work. We review the main decision points with the team and set the boundaries of authority. An escalation rule also needs a response time; knowing whom to call is of little use if a decision arrives after the shift has ended.
Measures are tied to actions. A monthly production result matters to management, but a shift team needs an earlier signal: a growing queue, a cycle-time deviation or material demand that has not been covered. We therefore keep leading process measures alongside the final KPI, giving the responsible person a chance to influence today's result rather than explain it next month.
SCOPE AND CONTROL
03
Software will not help if an undefined old routine is simply copied into a new system. We write ERP or production-monitoring requirements as working cases: who records the event, where the source data comes from, who may correct it and which decision a report is expected to support. This makes product comparisons more useful and helps remove features that the team will never use.
If a system has already been selected, we review implementation scope and acceptance criteria. A vendor's technical task should lead back to a result expected by the process owner. We help resolve gaps between management, users and the implementation partner, but do not hide business decisions inside the project schedule. The people involved need to understand how their daily work will change.
04
Actions are broken down so that each stage produces something that can be checked. It may be a revised planning cut-off, a new shift review or a pilot system workflow. Review meetings cover more than task status. If a decision has stalled, the obstacle and the person able to remove it must be named.
The final stage prepares the process to run without a consultant. Its owner takes over the review routine, the team has an agreed response to a deviation and management knows which conditions require renewed attention. We return after the agreed period to see whether the routine is being used. If it is not, we look for the specific cause instead of arranging another round of training by default.
WORKING BOUNDARIES
Before any work starts, we record what is being assessed, who can make decisions on both sides, which data is needed and how the outcome will be checked. We do not quote savings or speed improvements without a verified starting point.
Capabilities
Manufacturing process diagnosis, accountability and KPI routines, requirements for ERP or monitoring tools, implementation co-ordination and handover of the new working method to the team.
Indicative working sequence
A tightly scoped diagnostic stage will generally require 2–4 weeks. The first implementation cycle may take 6–12 weeks. Before work starts, this window is refined against the number of processes in scope, the condition of the data, decision lead times and any work assigned to external partners.
Operating geography
Our operating base is in Lithuania. The scope of logistics, process-improvement or system implementation work is agreed after reviewing locations, the balance of remote and on-site work, and the availability of the responsible teams.
Outcome assessment
The baseline period, calculation rule and source data are agreed before a target is set. A numerical range is discussed only after the starting data has been checked. It is a planning and review tool, not a guaranteed result.
BEFORE WE START
The first conversation defines the problem and the management decision it needs to support. We then set the assessment scope, list the required data, identify the people to speak with and state exactly what the assessment will deliver.
We do not begin with a predetermined product. The business and user requirement is defined first, after which we can support solution evaluation or coordinate the agreed scope of an already selected system.
Not necessarily. Where implementation is part of the proposal, we follow the action plan, decision dates, external partner work and handover of the new routine to the process owner.
Duration depends on the breadth of the problem, data availability, number of decisions and organisational readiness. After the initial discussion we can propose stages and interim outputs, but we do not apply the same timetable to every situation.
Tell us where the manufacturing process stalls and how it affects output, timing or cost. We will explain where to begin the assessment.